Since first participating in the Gyeongchun Line Double-Track Electrification Project under a turnkey contract in 1999, Seoyoung Engineering’s Railway Division has undertaken a wide range of railway projects for over 25 years, including private investment, turnkey, and technical proposal projects. With technical expertise developed through Value Engineering (VE) and extensive design experience, the division has established a competitive position in the railway construction sector.
The Railway Division has strengthened its technical capabilities through participation in national R&D projects focused on increasing operating speeds on high-speed railways, Personal Rapid Transit (PRT), and tilting train technology. It has also contributed to the expansion of national and regional railway networks through railway network planning, preliminary feasibility studies, and pre-feasibility studies.
The Railway Division provides comprehensive engineering services, from feasibility studies to basic and detailed design, for domestic and international projects covering high-speed rail, conventional rail, metropolitan rail, urban rail, and light rail transit. Recent major projects include the Goyang–Eunpyeong Metropolitan Railway, the Okjeong–Pocheon Metropolitan Railway, the Gangneung–Jejin Single-Track Electrified Railway Construction Project, the Pyeongtaek–Osong Quadruple-Track Railway Construction Project, and the Second Urban Railway Network Plan for Busan Metropolitan City.
In the urban railway sector, the division has participated in projects involving Seoul Subway Lines 7 and 9, Incheon Subway Lines 1 and 2, Gwangju Metro Line 2, and the Gimpo Urban Railway. Its metropolitan railway projects include GTX-A, the Goyang–Eunpyeong Metropolitan Railway, the Okjeong–Pocheon Metropolitan Railway, the Hanam Line, and the Jinjeop Line. The division also continues to expand its business scope through participation in mainline railway projects, including the Jungang, Gyeongchun, and Janghang Lines, as well as railway projects in Paraguay, Mongolia, and Egypt.
Basic design of the Seongnam~Yeoju dual-track subway is a railroad construction project for the increase in the demands for transportation in the southeastern region of inducing of dispersion of population of the urban centers in the region. And provide conveniences to the local residents of Gwangju, Icheon and Yeoju. The total length of Sector 6 is 8.5km including 2 stations, 3 bridges and tunnels.
The transportation convenience for the local residents which securing low environment pollution, generating public transportation and establishing linkage between metropolitan railroad network and arterial railroad network.
Currently, construction of bridges, tunnels, earthworks and stations (Ssangdong and Gonjiam) that span over key rivers and farming lands are nearing completion with the full completion of the project scheduled in 2016.





