CM
Construction project management
처음이미지

  The construction project management of Seoyoung has been satisfying the needs of the clients in dealing with social overhead capital (SOC – infrastructure) such as road, railroad, harbor, river, water supply, sewage system, etc. and overall areas of construction industry including large-scale private facilities.
In both the public and private sectors, construction project management is no longer an option but has become a requisite.
Through the construction know-how accumulated throughout the entire stages of the project including planning, approvals, permits, designing, construction, maintenance, the construction project management of Seoyoung is composed of the best professionals eliminating risks, safety/environmental accidents, etc. we also seek the efficient completion of the target structure by maintaining the highest quality and shortening project time, and reducing cost. In addition, our construction project management will not only reduce the cost of the project but also improve the value of the resulting structure through the advanced techniques including 4D simulation, BIM, etc.

◆ Project Achievements

  • · 2018 : Project management consulting service for Road Construction Golden Way Bridge and Outside Circle Road of 5th Life zone in Multifunctional Administrative C
    Construction project management of river environment improvement in Namgang Seochon district
  • · 2017 : Project management consulting service for Detour Road(Yongsang-GyorRi1)Construction within Andong-si
    Supervision Service for The National Maritime Police Pier Works of Pyeongtaek, Dangjin Port
    Supervision Service for Reinforcement Works of Breakwater & Wave Breaking Revetment in Guryongpo Port
  • · 2016 : Supervision Service for Coastal Maintenance Project in Yeosu&Manheung Area
    Supervision Service for Coastal Maintenance Project in Gungchon Port
  • · 2015 : Supervision Service for Reinforcement Works of Vulnerable districts to Disaster in Hongdo Port
    Supervision Service for Reinforcement Works of Outer Breakwater in Dadaepo Port
    Supervision Service for Reinforcement Works of Breakwater in Okgye Port
    Construction management for Ganghwa costal beltway(Site No. 2)
    Construction management for the Ssangchi~Sannae government-aided provincial road
    Construction management for the typhoon recovery project in Hwangsan, Gamcheon
  • · 2014 : Supervision Service for Reinforcement Works of Breakwater & Wave Breaking Revetment in Yugipo Port
    Supervision Service for Coastal Maintenance Works in Dadaepo Beach
    Supervison service for the Jeonju ecological stream restoration project
    Supervison service for Busan Ulsan Expressway~East Busan tourism complex connecting road construction project
  • · 2013 : Construction management for Roy Hill Project 4D process control system
    Supervison service for the Deoksong~Naegak private investment expressway
  • · 2012 : Construction management for Pyeongtaek(Godeok) industrial park development project
    Total Construction Supervision Services for Sangju-Yeongcheon Private Investment Expressway
  • · 2011 : Total Construction Supervision Services for Main Arterial Road of Busan New Port (Yokmang Mountain Section)
    Total Construction Supervision Services for Widening and Paving Geumho-Daechang Road, Phase 1
  • · 2010 : Supervison service for the 77th National Road Widening Project from Shingee to Googeum
    Supervison service for Choji Bridge construction project(Site No. 2-2)
  • · 2009 : Supervision service for the Jinsang~Hadong(Site No. 1) road construction project
    Supervision service for the Seoul metro line 9 phase 3 site no. 918 construction project
  • · 2008 : Total Construction Supervision Services for Connecting Bridge to the 3rd Dredged Soil Dumping Area of Incheon Southern Port
  • · 2007 : Supervision service for the access road construction project around Yeosu Industrial Complex(Site No. 1)
  • · 2006 : Supervision service for the Aengnam-Hwasun National Highway
  • · 2005 : Supervision service for the Jeongju~Namwon expressway site no. 6

◆ Key Projects

Responsible supervision of the restoration works on Cheonggyecheon Creek

Cheonggyecheon Creek Restoration Project was a highly important historical work of Seoul with national attention at the beginning of the 21st century.
Through the restoration of the Cheonggyecheon Creek, Seoul was converted into environment-friendly and human-centered urban space, and this project provided the opportunity for Seoul to lead the new paradigm in urban management in the 21st century and to renew the image of Seoul.
Along with the restoration of the cultural heritage site of Korea, Seoul was able to restore its 600 years of history and re-establish itself as a cultural city in which the tradition and modernity harmonize, thereby becoming a resting place and renowned tourist destination frequently visited by domestic and foreign tourists.
In addition, the project improved the surrounding environment and established new commercial zones, thereby inducing the advancement of Seoul as the hub city of Northeast Asia, international commercial city and financial hub city.
The foremost experts in the Construction Project Management of Seoyoung were at the background of the successfully completed environmental restoration project.

 

Name of the task: Full responsibility supervision services for the restoration works on Cheonggyecheon Creek
Location: General regions of the entry point of Taepyeong-ro ~ Gwangjang Market in Jung-gu, Seoul Metropolitan City
Area (distance)
Restoration construction works for Cheonggyecheon Creek (Sector No. 1)
Urban type creek restoration with L=1.9km
Organization of sewage system with L=6.7km
Construction of 9 bridges with L=3.9km
Construction of road with L=2.0km
1 set of landscaping and removal of structures
Organization of the ravines in areas around the Cheonggyecheon Creek
Organization of the Cheonggyecheon Creek with L=2.3km / Organization Jungrangcheon Creek with L=2.7km
Construction of 1 bridge with L=94.88m
Improvement of drop sections at 3 locations and supplementation of revetment with length of 280m
1 set of landscaping
Duration of the project: June 16, 2003~October 31, 2005
Client: Seoul Metropolitan City Government

  • 이미지1
  • 이미지2
LIST

COPYRIGHT SEOYOUNG. ALL RIGHTS RESERVED.