Core Project

Detailed Design Services for Constructing Expressway from Hamyang~Ulsan (Lot-4 & 13)

The project for the detailed design for constructing expressway from Hamyang~Ulsan (Lot-4 & 13) is focused on the establishment of the plans for more assertive expansion of the SOC and road networks for which the development has been promoted along with the completion of the 7 sessions of the 5 year’s planning of Economic Development in accordance with the progresses of our society.
Therefore, it is forecasted that continuous investments will be made into the Expressways in order to perform the role of the present as well as the future-oriented transportation road by establishing the expressway network that complies with the balanced development of the national land and rapidly increasing demand for transportation.
In alignment with such a trend, this Project will promote the development of the northern region of Gyeongnam for which the development is relatively lagging behind the surrounding regions by constructing expressway to supplement span of the east to west axis 1 and 2 (70km) of the national arterial road network plan (7x9) established by the Ministry of Construction and Transportation in 1992, which is wider than the average span of the East-West arterial road network (30~40km), and to play the role of the arterial thorough way for the industries and tourism that connects the Yeongnam and Honam regions by being linked with the Iksan~Jangsu Expressway.

 

Duration of the project: September 6, 2010~ December 20, 2014
Client: Korea Expressway Corporation
Construction Sector Lot-4
Location: Dundong-ri, Namsang-myeon, Geochang-gun, Gyeongsangnam-do ~ Gwajeong-ri, Shinwon-myeon, Geochang-gun, Gyeongsangnam-do
Scale
Length: L = 5.395km
Width: B = 23.4m (4-lane road in two directions), Separation sector = 11.4m (2-lane road in one direction)
5 bridges: 490.6m
1 tunnel: 3,902m
Construction Sector Lot-13
Location: Gwonhye-ri, Bulim-myeon, Euiryeong-gun, Gyeongsangnam-do ~ Daegok-ri, Bulim-myeon, Euiryeong-gun, Gyeongsangnam-do
Scale
Length: L = 5.02km
Width: B = 23.4m (4-lane road in two directions), Separation sector = 11.4m (2-lane road in one direction)
8 bridges: 2,507m
2 tunnels: 2,517m