Building information modeling(BIM) is emerging technology trends in construction and engineering fields.
Seoyoung Engineering Co., Ltd. plays a leading role in civil BIM works including establishment of BIM masterplan and development of system for efficient design work.
We offer the latest technologies solving the problems associated with BIM project, establishing BIM workflow and manual, analyzing BIM application effect, and developing BIM technologies in terms of design works.
Seoyoung Engineering Co., Ltd. is able to provide client satisfaction with the best services based on the cutting edge technologies and technical know-how.
BIM E-Brochure : https://online.flipbuilder.com/vgst/bglt/
Link https://online.flipbuilder.com/vgst/bglt/
File Download
Project Name: Construction BIM Design of Suseo-Pyeongtaek KTX Station in 5th Sector
Location of Project: Dongtan, Hwaseong City, Gyeonggi-do
Scale of Project: Construction of rapid transit railway between Suseo~Pyeongtaek with total length of 61.119km (with project value of 3.2718 trillion Won)
56.939km of tunnels (excavation of 3.4km, NATM 53.5km) among the total length of
61.119km / 3 stations and 19 units of ventilation stations
Sector 5: Total length 2.6km (Dongtan Station: L=632m, NATM, tunnel: L=1,968m, 2 work zones)
Areas of application of BIM:
4D Simulation: Application of data on the revision of construction schedule and planning data
Station structure model: Drawing up of the station structure and computation of the materials in accordance with the Revision
Equipment model: Analysis by applying the movement path of the equipment and operating radius
Earthworks model: Quantity takeoff for each of the soil types
Temporary installation model: Application of temporary installations and quantity takeoff in accordance with the changes in construction methods
Detail model: Drafting and review of the detailed model for the areas of detailed review
Construction BIM: Application of Shop drawing of BIM