-
Dreaming of health space in which water breathes.
Water that can be consumed with peace of mind and rivers through which cleanly treated clean water flows.
Efforts to pass down fresh and clean environment to next generations to come.
Design of water purification facilities for safe and clean water production
[Retrofit and renovation for advanced water treatment at Ddukdo water purification plant in Seoul (Q=700,000㎥/day, Turnkey), etc.]
Design of sewage treatment facilities that thoroughly treats the sewage generated from households and commercial facilities to return clean water back to the nature
[Design of Sosabeol sewage treatment plant in Pyeongtaek (Q=22,000㎥/day, Turnkey), etc.]
Design of industrial wastewater treatment facilities for treating wastewater from factories
[Design of Godeok wastewater treatment plant at Godeok industrial area (Q=102,000㎥/day, Turnkey), etc.]
We design and treat all aspects of water supply and sewerage system domestic ally and internationally including wastewater reuse facilities stormwater pumping stations, etc.
In addition, we provide flood prevention solutions by implementing our accumulated technical expertise and the latest modeling method in the area of flood and natural disaster in preparations for climate changes. Also, we provide services for the establishment of integrated management system such as block system and monitoring system for optimal operation & maintenance of water supply and sewerage facilities.
◆ Project Achievements
-
· 2023 : Basic and Detailed Design of diaster recovery business for the water sevice at Mungyeong City
Basic Plan for Sewage Maintenance of 2040 Incheon Metropolitan City
Basic Plan(2th) for Sewage Maintenance of Goyang City
Detailed Design for Integrated Water Purification Plant of Gapyeong
Basic and Detailed Design for Samsung Electronics WTP(3th) New Construction of Pyeongtaek
Feasibility Study for Water Distribution Systerm of Nakdong River Central Area
Basic Plan for Waterworks Maintenance and Technical Assistant for Water Supply Networks in Kimpo City
Technical Assistant Design for New Town WTP of Yangsan City
- · 2022 : Water Reuse Management Plan(2th) of Hapcheon County
4th Design for Public Wastewater Treatment Plant of Pyeongtaek Godoek
Godeok Industrial Complex 2nd Water Supply Facility Construction Detailed Design Service
Pyeongtaek godeok Publilc Wastewater Treatment Facility Phase 3 Detailed Design Service
Detailed Design Service for Osan Smart Pipe Network Infra Building Business
Basic and detailed design for the expansion of the Wongok Public sewage treatment facility
- · 2021 : Asan Complex UT Pipeline/Purification Reservoir Safety Diagnosis and Periodic Inspection Service
Godeok Phase 1 Capacity Expansion Design Service (Godeok Public Wastewater Treatment Facility (Phase 1))
Godeok Industrial Complex 2nd Water Supply Facility Construction Basic Design Service
Uiwang city sewer maintenance basic plan (change) establishment service
Feasibility study service for the double-tracking project for the central area of Chungcheongnam-do
Feasibility study service for the redundancy project for the central area of Chungcheongnam-do
Basic and detailed design for the expansion of the Jipyeong Reservoir and the Relocation of the Reservoir Reservoir for 1 location
- · 2020 : Basic and detailed design service for Chilgok-gun local waterworks modernization project
Detailed design service for private investment project for small-scale public sewage treatment facility construction in Yeosu
Detailed design of sewage treatment facility improvement project in Munsan, Gwangtan, Paju Court, Paju-si
Basic Planning Services (Partial Revision) of Water Supply Maintenance in Euiwang-si
Inspection and Repair Services for Utility Pipe in Asan 2 District for 2020
-
· 2020 : Basic Planning Services for Old Waterworks Pipe Maintenance (Gyeonggi-do)
- · 2019 : Preliminary Design Services for Installation of Food Waste Effluent Bio-energy Facility
Preliminary and Detailed Design Services for Flooding-prevention Project of Main Sewerage Maintenance Area in Boseong-eup
Consulting Services for Detailed Design and Supervision of the Sewerage System Development in Ta Khmau Town
- · 2018 : 2018 PMC Consulting Services for Pichanaki Water Supply System in Chanchamayo, Peru
Preliminary and Detailed Design Services for Expansion of Gochon Purification Plant
- · 2017 : Preliminary and Detailed Design Services for Infrastructure in Energy Industrial Complex and etc.
Alternative Design Services for Modernization of Local Water Supply in Changnyeong-gun
Preliminary Design Services for Industrial Water Supply to Paju-si LCD Industrial Complex (Private Investment Project)
- · 2016 : Preliminary and Detailed Design Services for Eastern Jinhae Sewage Treatment Plant
Engineering Services for Sewerage Advanced Management
PMC Consulting Services for Trial Operation, Facility Improvement and Post Management of Drinking Water System in Ascencion de Guarayos
- · 2015 : Alteration of basic plan for Yeoju city sewerage improvement
Preliminary design service for Jingun(Namyangju) green water center extension private investment project
Preliminary and detailed design Uljin public wastewater treatment facility extension project
- · 2014 : Preliminary design services for 2013 Pohang city sewer improvement, on a BTL basis
Preliminary and detailed design services for water supply facility improvement project in Geum river
- · 2013 : Master plan services for water demand management of Gunpo city
Preliminary and detailed design services for sewage treatment plant of Jeongok maritime industrial park, phase 1
Preliminary and detailed design services for sewage treatment plant of Godeok general industrial park, phase 1
- · 2012 : Project management consultancy for improvement of drinking water system in Ascencion de Guarayos
- · 2011 : Detailed design services for Pyeongtaek Sosabeol sewage treatment plant construction
Preliminary design services for sewage treatment plant of Jeongok maritime industrial park, phase 1
Alteration of basic plan for advanced sewage treatment plant of Cheonan 3rd green center
- · 2009 : Preliminary design service for the Sosabeol sewage treatment facility in Pyeongtaek, on a turnkey basis
New advanced water treatment facilities in Ttukdo WTP in Seoul, on a turnkey basis
◆ Key Projects
- Preliminary Design Services for Sewage Treatment Plant of Maritime Industrial Complex
2011 Preliminary Design Services for Sewage Treatment Plant of Maritime Industrial Complex
Facility Capacity : 1st Phase 1,500m³/day, 2nd Phase 1,500m³/day(A=14,937m2)
Discharge Pipe : D200, L=1,474m