-
Efficient use of the water resources is the foundation of affluency and safety of people.
Roles of rivers are undergoing transition from the space for the simple water transportation and flood control in the past to well-being, culture and leisure space for the residents.
The water resources team of Seoyoung Engineering is planning environment-friendly river spaces through the multitude of restoration of the ecological rivers and establishment of waterfront spaces.
In addition, we are equipped with experiences and skills in a diverse range of areas including basic plan, basic and detailed design for rivers, turn-key alternative design, restoration of ecological river, private sector investment project, etc.
The water resources team of Seoyoung Engineering pledges to offer the best output through the systematical execution, and with strong sense of responsibility based on a diverse range of tools for accurate analysis, accumulated know-how and ceaseless researches.
◆ Project Achievements
-
· 2024 : Preparation of a basic plan for the river and management ledger for river facilities in the northern Yeongseo region
Establishment of a Safety Inspection and Maintenance Plan for Small Public Facilities in Taean-gun
Analysis and evaluation of the Uljin-gun Typhoon Mitak disaster recovery project.
- · 2023 : Basic and detailed design for the Gwansan Goeup District (local river) natural disaster risk improvement district maintenance project
Disaster impact assessment for Sejong Yeongi public housing district development project
Detailed design for the Maintenance Project of the Hampyeong Eomdacheon District Natural Disaster Risk Improvement district
Basic and Detailed Design for the Maintenance Project of Hongcheon´s Natural Disaster Risk Improvement District
Basic and Detailed Design for the Maintenance Project of the Shingi Disaster Risk Improvement District
Gwangmyeong Haan 2 Public Housing District Disaster Impact Assessment
- · 2022 : Establishment of a comprehensive maintenance plan for local rivers in Incheon Metropolitan City
Hangang River tributaries (16 including Hanggeumcheon) River basic plan (re-establishment)
Establishment of Ganghwa-gun Comprehensive Plan for Natural Disaster reduction
Detailed Design for the Maintenance Project of the Hwasu Natural Disaster Risk Improvement District
Basic and Detailed Design for the Maintenance Project of Seokgi-nae Natural Disaster Risk Improvement District
Disaster impact assessment for Seongnam Shinheung District 1 redevelopment maintenance project
Disaster Impact Assessment for the Yangsan Deokgye Public Support Private Rental Housing Supply Promotion District
Emergency contract for four disaster impact assessment services, including reorganization of the 31st Division Reserve Forces Training Corps
Renegotiation for Disaster Impact Assessment in Goyang Changneung Public Housing District
Establishing small-scale public facility safety inspection and maintenance mid-term plan establishment in Dalseong-gun
Establishment of rainwater runoff reduction measures in Yangsan City
- · 2021 : Establishment of basic river plan for Jasancheon and two rivers and preparation of river facility management ledger
Re-establishment of the Sangpyocheon River basic plan and preparation of the river facility management ledger
Re-establishment of the Basic River Plan for the Sincheon area (including 14 areas such as Hongjukcheon)
Detailed Design for the Geumgang River Yeongdong District River Maintenance Project
Disaster Impact Assessment for the Construction of the Multifunctional Administrative City Project (Renegotiated)
Disaster Impact Assessment for the Asan Tangjeong 2 Urban Development Project
Establishment of a Comprehensive Plan for Small River Maintenance in Miryang City
- · 2020 : Detailed design for two local river maintenance projects, including Eunhaengcheon Stream
Basic and detailed design of Haechangman District 2 disaster risk district maintenance project
Disaster impact assessment of Namyangju Wangsuk public housing district
-
· 2020 : Basic and detailed design of Jeongji-ri natural disaster risk improvement district maintenance project
- · 2019 : Establishment of Ganghwa-gun Comprehensive Plan for Natural Disaster reduction
Detailed design of Mugeuk Natural Disaster Risk Improvement District
Mongolia Ulaanbaatar Veterinary Medical Capacity Building Project PMC
PMC, a project to strengthen the agricultural technology distribution system for small-scale farmers in Mozambique
- · 2018 : Construction of Agricultural Technology Training Center in Cambodia(PMC)
Services for basic plan and river facilities management resister for Donghwa-river including six district
Services for basic plan and river facilities management resister for Balan-river including three district
Services for basic plan and river facilities management resister for Ewha-river including eight district
- · 2017 : Master plan for Pocheon City ecological river Restoration Project
Comprehensive flood damage reduction planning for Okcheon
Services for basic plan and river facilities management resister for Yeomul-river including thirteen district
Services for basic plan and river facilities management resister for Jojong-river including eleven district
- · 2016 : Re-establishment of basic plan for improvement of small rivers in Yeongam-gun and public announcements of topographical maps
- · 2015 : Basic plan(alternation) and detailed design of ecological river restoration project in Daegang stream
Re-establishment of basic plan for improvement of small rivers in Gurye-gun and public announcements of topographical maps
Re-establishment of basic plan for improvement of small rivers in Yeongdeok-gun and public announcements of topographical maps(District 1)
- · 2014 : Detailed design for river environment maintenance of Nam river Daesan district included another 1 place
- · 2013 : Basic plan(alternation) and river management inventory preparation for upstream of Geumho river
Comprehensive reduce plan against damage from storm and flood and disaster mapping for Seoul
- · 2012 : Establishment of water circulation system and feasibility study for Songdo district
Detailed design services for stream rehabilitation of Yeongcheon dam direct downstream
- · 2011 : Detailed design services for Jojong stream and another rural river rehabilitation
Basic plan for gap stream rehabilitation
- · 2010 : Preliminary and detailed design service for the Geum river restoration project (lot-5, Buyeo region)
Preliminary and detailed design service for the Nakdong river restoration project (lot-25)
- · 2009 : Preliminary and detailed design service for the Yeongam and Dopo stream ecological waterway recovery project
Preliminary and detailed design service for the Magok waterfront
Preliminary and detailed design service for the Han river restoration project (lot-4)
- · 2008 : Preliminary and detailed design service for the Incheon Chungla zone shipping facilities construction project