Along with the best and optimal designing of various infrastructural structures, we are acting as a leading in the areas of the designing of long-span bridges on the basis of the accumulated design experience and know-how for various special bridges, in particular the Gwangan bridge, Yeongjong bridge and Incheon bridge, which all can be represented as an axis of the history of bridge construction in Korea.
Seoyoung has technological capabilities for super long-span bridge constructions based on exhaustive preparations for the adoption of advanced designing technique, ceaseless technology development and the best design capabilities in Korea.
The project aims to alleviate chronic traffic congestion around Wonchon Bridge by redistributing traffic and improving connectivity between Yuseong-gu, Daedeok-gu, Munji District, and the Daedeok Research Complex.
The project was included in the Third Plan for Metropolitan Area Traffic Congestion Road Improvement Projects (2016–2020), established by the Ministry of Land, Infrastructure and Transport in 2016 pursuant to Article 8 of the Road Act.




