Along with the best and optimal designing of various infrastructural structures, we are acting as a leading in the areas of the designing of long-span bridges on the basis of the accumulated design experience and know-how for various special bridges, in particular the Gwangan bridge, Yeongjong bridge and Incheon bridge, which all can be represented as an axis of the history of bridge construction in Korea.
Seoyoung has technological capabilities for super long-span bridge constructions based on exhaustive preparations for the adoption of advanced designing technique, ceaseless technology development and the best design capabilities in Korea.
The project establishes an integrated urban water circulation plan for Phase 1, Zone 1 of the West District of Songsan Green City, incorporating water quantity, water quality, aquatic ecosystems, and water reuse.
It also develops a master plan for an urban blue-green network linking recreational waterways, lakeside and linear parks, and infrastructure such as underpasses and bridges. The plan promotes sustainable water management and creates an integrated waterfront environment.





