
Along with the best and optimal designing of various infrastructural structures, we are acting as a leading in the areas of the designing of long-span bridges on the basis of the accumulated design experience and know-how for various special bridges, in particular the Gwangan bridge, Yeongjong bridge and Incheon bridge, which all can be represented as an axis of the history of bridge construction in Korea.
Seoyoung has technological capabilities for super long-span bridge constructions based on exhaustive preparations for the adoption of advanced designing technique, ceaseless technology development and the best design capabilities in Korea.
Saryang Grand Bridge
Saryang Grand Bridge is planned to be constructed between Saryang sang-do and Saryang Ha-do. This is asymmetric cable stayed bridge adapt to steel-concrete composite girder consisting of two concrete pylon of each side with different heights and a main span 265m.
Country : Republic of Korea
Client : Tongyeong-si / Samsung Heavy Industries E&C
Fee of Services : 1,449,910,000
Contract Period : 2009.6 ~ 2009.9
Data Summary :
Bridge Type : Asymmetric steel-concrete composite cable stayed bridge
Length : 510m
Main Span : 265m
Width : 14.5m
Contents of Works : Design stage : ∙Structural analysis
∙Detail Design
∙Checking of Construction Method
∙Construction Cost Estimation
∙Environmental Investigation