
Along with the best and optimal designing of various infrastructural structures, we are acting as a leading in the areas of the designing of long-span bridges on the basis of the accumulated design experience and know-how for various special bridges, in particular the Gwangan bridge, Yeongjong bridge and Incheon bridge, which all can be represented as an axis of the history of bridge construction in Korea.
Seoyoung has technological capabilities for super long-span bridge constructions based on exhaustive preparations for the adoption of advanced designing technique, ceaseless technology development and the best design capabilities in Korea.
Hwa-Po Bridge
Hwa-Po Bridge is planned to be constructed on Hwa-Po wetland area.
This is the first asymmetric concrete cable stayed bridge adapted to concrete edge girder in the Republic of Korea, consisting two pylon with different heights and main span of 260m.
This bridge type is an original bridge type, reducing environment risk in the construction and enhancing stability under wind, seismic loads.
Country : Republic of Korea
Client : Gyeongsangnam-do Office / Samsung C&T
Fee of Services : \6,509,140,000
Contract Period : 2005
Data Summary :
Bridge Type : Asymmetric Concrete cable stayed bridge
Length : 520m
Main Span : 260m
Width : 24m
Contents of Works : Design stage : ∙Structural analysis
∙Detail Design
∙Checking of Construction Method
∙Construction Cost Estimation
∙Environmental Investigation