
Along with the best and optimal designing of various infrastructural structures, we are acting as a leading in the areas of the designing of long-span bridges on the basis of the accumulated design experience and know-how for various special bridges, in particular the Gwangan bridge, Yeongjong bridge and Incheon bridge, which all can be represented as an axis of the history of bridge construction in Korea.
Seoyoung has technological capabilities for super long-span bridge constructions based on exhaustive preparations for the adoption of advanced designing technique, ceaseless technology development and the best design capabilities in Korea.
Wando Bridge is planned to be constructed between Heanam and Wando Island. The bridge four-span non-symmetrical cable stayed bridge with a main span of 200m.
The cable stayed girder is stiffened steel box girder carrying two traffic lanes in each direction. Single pylon is planned as steel box shaped "A" type.
Country : Republic of Korea
Client : IKsan Regional Construction Management Administration / Samsung C&T
Fee of Services : \1,408,000,000
Contract Period : 2002.8 ~ 2002.12
Data Summary :
Bridge Type : 4 spans Single Pylon Cable Stayed Bridge
Length : 500.0m
Center Span : 200.0m
Pylon Height : 75.0m
Width : 25.9m
Contents of Works :
Design stage : ∙Structural analysis
∙Detailed Design
∙Checking of Construction Method
∙Construction Cost Estimation
∙Environmental Investigation
∙Traffic Forecast