Along with the best and optimal designing of various infrastructural structures, we are acting as a leading in the areas of the designing of long-span bridges on the basis of the accumulated design experience and know-how for various special bridges, in particular the Gwangan bridge, Yeongjong bridge and Incheon bridge, which all can be represented as an axis of the history of bridge construction in Korea.
Seoyoung has technological capabilities for super long-span bridge constructions based on exhaustive preparations for the adoption of advanced designing technique, ceaseless technology development and the best design capabilities in Korea.
The project aims to establish a new railway network connecting the Seoul Metropolitan Area with the inland regions of Gyeongsangnam-do and Gyeongsangbuk-do, as well as the southern coastal region, thereby improving regional accessibility. By linking the Gyeongbu High-Speed Railway and the Suseo–Pyeongtaek High-Speed Railway with the Southern Inland Railway, the project will enable travel between the Seoul Metropolitan Area and Geoje in approximately 2 hours and 40 minutes. It is also expected to create local employment opportunities, support the early recovery of regional economies, promote tourism along the southern coast, and contribute to balanced national development by expanding access to high-speed rail services.



