
Along with the best and optimal designing of various infrastructural structures, we are acting as a leading in the areas of the designing of long-span bridges on the basis of the accumulated design experience and know-how for various special bridges, in particular the Gwangan bridge, Yeongjong bridge and Incheon bridge, which all can be represented as an axis of the history of bridge construction in Korea.
Seoyoung has technological capabilities for super long-span bridge constructions based on exhaustive preparations for the adoption of advanced designing technique, ceaseless technology development and the best design capabilities in Korea.
1111 Bridge
1111 Bridge is planned to be constructed between Aphae Island and Amtae Island. This bridge consist of two pylon cable stayed bridge carrying two traffic lanes. Total length of bridge is 1,811m with 1,111m main span and the pylon height of 129m.
Country : Republic of Korea
Client : Iksan Regional Construction Management Administration / Samsung C&T
Fee of Services : \-
Contract Period : 2009.6 ~ 2009.9
Data Summary :
Bridge Type : two pylons Cable Stayed Bridge
Length : 1,811m
Main Span : 1,111m
Width : 24m
Contents of Works : Design stage : ∙Structural analysis
∙Detail Design
∙Checking of Construction Method
∙Construction Cost Estimation
∙Environmental Investigation