Railway

 Railway department of Seoyoung has achieved outstanding growth by participating in the entire railway project including private/turnkey/technical proposal for more than 20 years since it started to participate in the turn-key project for the dual-track Gyeongchun Railroad Line in 1999. Our company maintains the highest level of sales per person over the last 3 years. Railway department, a late entrant in the industry, succeeded in sighing the turn-key projects in a competitive design market through accumulated experiences by value engineering.
Not stopping at the achievements of the past, the railway department continually participates in the national R&D project including the infrastructural research for the improvement of the speed of the rapid transit railroad. PRT research services and improvement of the speed of the existing lines through the inputting of tilting railway trains enhance the technologies to lead the future national railroad projects. In addition, we have made contributions towards the building up of the national railroad network by executing several preliminary feasibility studies.
Railway department has been providing various services including feasibility study, basic plan, basic and execution designs for the railroad construction projects in Korea and overseas that encompasses rapid transit railroad, general railroad, metropolitan railroad, urban railroad and light rail transit, etc. Moreover, we are promoting the advanced railroad construction technology of Korea through the operation of railroad technology school in Paraguay in South
America and expanding it to other countries such as Mongolia, and putting in efforts in social participation through technology transfer to developing countries.
We participated in urban railroad construction projects including the Subway routes 7 and 9 in Seoul, Subway routes 1 and 2 in Incheon, Subway route 3 in Daegu, Hanam line, Gimpo city railroad and Jinjeop line, etc. Also in numerous arterial line railroad projects such as Jungang line, Gyeongchoon line, Janghang line and Gyengjeon line, etc. were planned and designed by Seoyoung. 

◆ Project Achievements

  • · 2019 : Feasibility study for Railway modernization project of Egypt Luxor~High Dam
    Pre-feasibility study for Extension of Line 6 and Transfer of Sinnae Train Depot
    Preliminary and detailed design for Cheongna International City Extension of Seoul metropolitan railway Line 7(section 3)
    Feasibility study and Preliminary plan for Incoming railway of Seongmun National Industrial Complex
  • · 2018 : Detailed design service for the private investment project of East North LRT(Wang Sib Ri~Sanggye)
    Preliminary design service for the private investment project of Great Train Express Line A
  • · 2017 : Pre-feasibility and feasibility study on LRT Line in Western Sri Lanka
    Detailed design for Gwangju Metro Line 2 Phase 1
    Pre-feasibility study for Railway Line capacity expansion
    Detailed design for Jungbu-Naeryuk line Icheon~Munkyeong railway roadbed construction lot 9
  • · 2016 : Detailed Design Service for Shinlim LRT Private Investment Project
    Myanmar Mandalay ~ Myitkyina Railway Rehabilitation and Modernization Feasibility Study
  • · 2015 : Feasibility study and preliminary design services for Great Train Express
    Preliminary and detailed design services for sector 5 of the dual-track subway of Hanam line (Sangil~Geomdansan)
    Pre-feasibility study of Paraguay Encarnacion LRT(light rail transit)
    Preliminary and detailed design services(T/K) for sector 4 of the dual-track subway of Hanam line (Sangil~Geomdansan)
    Basic design review, preliminary study & analysis and detailed design for Ukhaa Khudag~Gashuun Sukhait railway project
    Feasibility study and preliminary design services for Cheonan~Cheongju airport
    Preliminary and detailed design services for Dodam~Yeongcheon double track railway lot 3 & 5 of the central line
  • · 2014 : Detailed design services for east sea line(Wonnam~Jukbyeon, Yeonghae~Hupo) railway trackbed construction project
    Preliminary design services for the Jinjeob line(Danggogae~Jinjeob) lot 3 double tack railway construction project(T/K)
  • · 2014 : Preliminary and detailed design services for the Busan subway(Sasang~Hadan line) lot 5 construction project(T/K)
    Trackbed preliminary design for the Poseong~Pyeongtaek railway lot 2 construction project
    Feasibility study for Paraguay Encarnacion~ Artigas railway construction project
  • · 2013 : Preliminary and detailed design services for Gimpo subway lot 3 trackbed construction project
    Dual-track railway design for the Bujeon~Masan BTL project
    Feasibility study for Paraguay railroad construction project(railway across South America)
  • · 2012 : Preliminary and detailed design services for Ulsan new port lead-In railroad trackbed
    Preliminary and detailed design services for Hongseong~Songsan double track railway construction (lot 10) of west sea line
  • · 2011 : Preliminary and detailed designs for railway relocation of submerged districts around the Yeongju dam
    Tender design for Delhi MRT’s project of phase-Ⅲ
    Trackbed detailed design for inlet rail to Gunjang national industrial complex section 1
  • · 2010 : Trackbed alternative designs for sections 1 and 2 of the Honam High Speed Railway (HSR) 1-2
    Preliminary and detailed design for Seoul Metro Line 9(section 919) – T/K
  • · 2009 : Preliminary and detailed design for Incheon subway line 2(section 213)-T/K
  • · 2008 : Trackbed preliminary design for the Honam HSR section 6
  • · 2007 : Detailed design for Daegu urban railway section 3-3
    Double-tracking project of the Jeolla railway line(BTL)
  • · 2006 : Detailed design services for Bujo~Pohang railway construction of east sea line
  • · 2005 : Basic design for the sector 6 of the Seongnam~Yeoju dual-track subway
  • · 2004 : Detailed design service for the private investment project of Yongin light rail transit (LRT)

◆ Key Projects

Yongin Light Rail Transit
Yongin Everline, which is accomplishing the innovation in public transportation as a new transportation method in the concept of improved convenience, beautiful environment, low cost and low pollution and fully automated and unmanned system.
We executed the Yongin Everline design that links people with nature.
This project effectively copes with the rapidly increasing traffic demands and establishes pleasant and environment-friendly urban traffic system in Yongin City.
And, this project of the total length of 18.404km is composed of 15 stations and 1 depot.
Most of the main lines are planed as elevated structure to minimize the impact on the existing road traffic.
The optimal linear design plan established by detailed examing of housing development around construction area and the situation of the rivers.
The steel box girder bridge was applied to ensure structural stability in the large curve area, long span, the YoungDong Highway crossing section.
The PSC U girder bridge was applied for environment-friendly and to minimize noise and vibration in Dongbaek housing development districts and adjacent residential area.
Yongin Everline opened for operation on April 26, 2013 has linked the Giheung Station and the Jeondae and Everland Station within 30 minutes. It is being operated with strict adherence of the interval of 3~4 minutes during the peak hours of the day to offer more convenient services to its users.

 

  • 이미지1
  • 이미지2
  • 이미지3
  • 이미지4
  • 이미지5
  • 이미지6
  • 이미지7
  • 이미지8
  • 이미지9
  • 이미지10