-
Along with the best and optimal designing of various infrastructural structures, we are acting as a leading in the areas of the designing of long-span bridges on the basis of the accumulated design experience and know-how for various special bridges, in particular the Gwangan bridge, Yeongjong bridge and Incheon bridge, which all can be represented as an axis of the history of bridge construction in Korea.
Seoyoung has technological capabilities for super long-span bridge constructions based on exhaustive preparations for the adoption of advanced designing technique, ceaseless technology development and the best design capabilities in Korea.
◆ Project Achievements
-
· 2017 : Construction engineering works of E-RING Road North/South Link
Design and Build(T/K) for Construction of Woongcheon-Soho in Yeosu
- · 2016 : Construction engineering works of Riyadh Metro Project
Alternative design services for the connecting project of the Hajo-Nabae island in Jindo
- · 2015 : Detail design services for overbirdge at Samsung electronics site
Basic design services for Mi-ho-chun 2 bridge on multifunctional administrative city
Detailed design and construction engineering services for Saudi Arabia Riyadh Metro
Preliminary and detailed design services for Godeok new international town road detail design (Jin-we-chun bridge)
- · 2014 : Detailed design services for Hamyang~Ulsan expressway construction project(site no. 4, Sa-Chun bridge)
Detailed design for connecting upper space of Sujeong tunnel, Busan
Preliminary and detailed design services between Dujuk~Soya island bridge
- · 2013 : Detail design services for bridges on multifunctional administrative city site no. 1-1
Feasibility study for Yeongjong~Ganghwa road construction(Pyong hwa bridge)
Detail design services about the improvements of capacity for Jang An bridge
- · 2012 : Test bed design and examples based on Korean highway bridge design code(limit state design)
-
· 2012 : Detail design services for bridges on Hwasung~Dongtan site
Detailed design services for Dodam~Yeongcheon railway lot 1 of the central line
- · 2011 : Multifunctional administrative city~Daedeok techno valley road(lot 2) construction(Gujeuk bridge, cable-stayed bridge)
- · 2009 : Preliminary design services for Aphae~Amtae(lot 2) road construction(1111 bridge, cable-stayed bridge)
Detailed design services for Jeokseong~Jeongok road construction (Dongyi 1 bridge, cable-stayed bridge)
Detailed design services for Goyeong~Hadong IC2 national highway construction (the 2nd Namhae bridge, suspension bridge)
Detailed design services for Saryang bridge (cable-stayed bridge)
Detailed design services for green art pedestrian bridge (silk bridge)
- · 2008 : Preliminary design services for Honam high-speed railway(lot 1-1) construction T/K (Osong overpass, PCT girder bridge)
- · 2007 : Preliminary design services for the 1st Geum river bridge in multifunctional administrative city(extradosed bridge)
- · 2006 : Detailed design services for Hanlim~Saengrim road construction (Hwapo bridge, cable-stayed bridge)
Yeosu industrial complex access road construction project (T/K) (Nambit bridge, suspension bridge)
Preliminary and design services for Dubai Palm Jebel Ali entry bridge and connection bridge
- · 2004 : Preliminary and design services for Incheon 2nd bridge construction bridge(Incheon bridge, cable-stayed bridge)
- · 2002 : Detail design services for the widening and paving project of Gunoe~Namchang(Wando bridge, cable-stayed bridge)
◆ Key Projects
- Preliminary Design Service for T/K Project Multifunctional Administrative City Geum River 1 Bridge Construction
Geum River-1 Bridge
Geum River 1 Bridge is planned to be constructed crossing the Geum River as an Extradosed P.S.C box girder. This bridge has its total length of 730m with 230m main span carrying 4-lanes. This bridge consists of reinforced concrete pylon and P.S.C box girder.
Country : Republic of Korea
Client : Korea Land & Housing Corporation / Samwhan Corporation
Fee of Services : 3,016,200,000
Contract Period : 2007,8 ~ 2007,11
Data Summary :
Bridge Type : 4 spans - three pylon Steel-Concrete Composite Extrdosed
Length : 730m
Center Span : 230m
Width : 30m
Contents of Works :
Design stage :∙Structural analysis
∙Detailed Design
∙Checking of Construction Method
∙Construction Cost Estimation
∙Environmental Investigation
∙Traffic Forecast